Design and installation of a supply system for high quality sealing liquids on the assembly line of Toyota at the Kolin plant. The system integrates equipment for discharging storage, pumping and filling of various liquids (fuels, brake fluids, gearbox fluid, coolant, windscreen wiper fluid).
2003 - 2004
Czech Republic
Food & Beverages - New Headquarters
For Fortis Lease, Technum realised the new headquarters of Interbrew in Leuven. This offices building covering 15,500 m² is composed of 10 floors including 3 underground levels for parking and archive rooms.
2002 - 2004
Belgium
Petrochemical - I&C optimisation
Design of the Instrumentation & Control system of the Total Petrochemicals plant in order to allow the mixed combustion in the "Boiler South 2" of the site. It will allow to burn simultaneously "fuel oil" and "fuel gas" (produced on the site), and this with a more flexible control of the boiler load.
2005 - 2005
Belgium
Automotive - Master plan
In order to improve the efficiency and style of the site of Ford Lommel, Technum realised a complete restructuration of the site: new organisation of the workshops, circulation of test-cars and the exchange of information between the engineering department, the test pilots and the mechanics while taking care of environment and architectural aspects.
2000 - 2005
Belgium
Refining - CHP extension
Review of the design, technical assistance during bid evaluation, electrical and steam stability study, and definition and follow-up of the performance tests for the implementation of a combined heat and power plant of GALP, composed of two 40 MWe gas turbines coupled to two Heat Recovery Steam Generators.
2005 - 2006
Portugal
Chemical - Cogeneration plant
Prefeasibility study for the implementation of a cogeneration plant for Lanxess on the left bank of the Scheldt near Antwerp. The plant is designed to deliver 50 MW electrical output and 120 t/h MP steam as an average, based on a 40 MW class gas turbine. A part of the electricity will be consumed by the plant, the rest being exported to the grid through a 36 kV substation.
2006 - 2006
Belgium
Iron & Steel - Master plan and feasibility study
Master plan, conceptual feasibility study and technical assistance for the 15 kV supply system of the Corus Duffel aluminium hot and cold rolling mill, die casting and extrusion plant.
2006 - 2006
Belgium
Glass - 150 kV supply for Owens Corning
Optimisation of the electricity supply to the plant, evaluation of different alternatives, and turnkey supply of a 150/15 kV transformer and its integration in the existing 15 kV distribution system of Owens Corning.
2001 - 2006
Belgium
Petrochemical - Pipeline projects
Relocation studies for ethylene, propylene and hydrocarbon pipelines in the Antwerp Port area for Total, and a feasibility study for an ammonia pipeline to deliver ammonia from its production facility directly to the client.
2005 - 2006
Belgium
Pulp & Paper - Bio-Fuel & waste fired CHP plant
Feasibility study for the implementation of a CHP plant burning biomass and waste products for the Storaenso paper mill. The plant will deliver steam to the industrial process and electricity after passing through the steam turbine. Thermal power output will be of 145 MWth.
2006 - 2006
Belgium
Pharmaceutical fermentation plant
Design, project management and construction management for the extension of the Lonza Biotech high tech pharmaceutical plant.