Suez Energy International and Mercosul entrusted us the construction contract management support for the implementation of the hydroelectric power plant on the Cana Brava dam, composed of a gravity dam in roller compacted concrete (h = 65 m), an earthfill dam (h = 65 m), a water intake and a 3 x 150 MW powerhouse.
1999 - 2002
Brazil
Berke dam and hydropower plant
Feasibility study, basic and final design and works supervision for the construction of the Berke Arch dam (h=201 m) and hydroelectric development (510 MW).
1988 - 2002
Turkey
Rehabilitation of the Butchenbach Dam
Rehabilitation and waterproofing of the Butchenbach multi-arch dam of Electrabel, in the Belgian Ardennes. Placing of a watertight PVC-film upstream connected with a drainage system to collect residual moisture.
Development of the detailed design and supervision of the civil works construction and supply, erection, testing and commissioning of the electromechanical equipment for Hidropaute.